Summary

Size filtration area or check installed dry-solids capacity from a constant-pressure cake-resistance test and a specified operating cycle.

Ribbon Flowsheet → Dewatering → Filters

Model key DPSIM.Dewatering.CakeResistanceFilter

Ports

PortDirectionMeaning
FeedInputSlurry to be filtered.
Wash waterOptional inputClean wash water included in the liquid balance.
CakeOutputAll dry feed solids and water at the specified final cake moisture.
Filtrate + drainageOutputFormation filtrate, post-formation water and optional wash water.

Configuration in DPSIM

  1. Open the filter editor. Set Operating Basis, including formed-cake dry solids, final moisture, cycle timing and the number of active units.
  2. In Test Data choose entered resistances or Fit constant-pressure test. For a fit, enter the test conditions and paste two spreadsheet columns, or enter one volume:time pair per line.
  3. On Review, inspect fitted resistances, test basis and active area. Apply and run to record the case in Calculated Parameters.
  4. Check product water and the capacity margin at the installed area. Connect Wash water only for clean water and allow time for it in the cycle.
The filter Review shows the resistance basis and calculated loading and area.
The filter Review shows the resistance basis and calculated loading and area.

Parameters and units

InputUnits or optionsInitial value or basisUse
Operating modeSize required area or Check installed capacitySize required areaUse installed mode with active area per filter and the number of operating filters.
Identical filters and installed areaCount and m² per filter1 and 10 m²Use active operating filters. Total installed area is count times per-filter area.
Operating pressure and viscositykPa and mPa·s100 and 1Use the values for the actual cycle. DPSIM converts to Pa and Pa·s.
Formed cake dry solids and final cake moisture% w/w and % wet basis66.7 and 20These are two distinct process conditions. Final cake must be at least as dry as the formed cake.
Cycle stagessFormation 200.2, wash 0, post-formation 20, turnaround 9.8Set elapsed times for each stage. A positive wash inlet needs a positive wash time.
Resistance source, α and RₘEntered or fitted, m/kg and m⁻¹Entered, 10¹¹ and 10⁹Use resistances for the material and pressure range, or fit from test data.
Test area, pressure, viscosity and Cm², kPa, mPa·s and kg/m³Enter actual test values for fittingUse dry solids retained per m³ of formation filtrate for the test C.
Filtrate test pairsLitres and secondsMeasured positive volume and timeUse at least two strictly increasing positive pairs. The optional origin 0:0 is excluded from regression.

Calculation and assumptions

Constant-pressure formation

Let V be formation filtrate volume, A active area and z = V/A in m³/m². C is dry retained solids per m³ of formation filtrate. Use α in m/kg, Rₘ in m⁻¹, μ in Pa·s and ΔP in Pa.

tₑ = (μ/ΔP) [Rₘ z + α C z² / 2]
tₑ/z = (μRₘ/ΔP) + [μαC/(2ΔP)] z

Fit and operating calculation

The unweighted fit of tₑ/z against z recovers Rₘ from the intercept and α from the slope using the laboratory pressure, viscosity and C. DPSIM rejects substantially negative fitted resistance. In operation, C comes from the feed dry solids divided by water displaced during formation. Post-formation drainage and wash water are outside that formation volume.

Area and capacity

At the selected formation time, solve the positive root for z. The dry loading per active area per cycle is Cz. With feed dry mass rate S in kg/s and complete cycle time T in seconds, calculate required total area and installed dry capacity.

Dry loading per cycle = C z
Required area = S T / (C z)
Installed capacity = installed active area × C z / T

Water balance

Formed-cake water follows the formed solids mass fraction. Final cake water follows the entered wet-basis moisture. Their difference is post-formation drainage. The liquid product combines formation filtrate, drainage and any wash water. All feed dry solids report to Cake by size and component.

Application limits

Use representative constant-pressure tests and check pressure transfer if operating and test pressures differ. The model assumes fixed resistances, complete solids capture and a specified final moisture. Cake compressibility, fine-solids breakthrough and washing efficiency require separate test data or analysis.

Calculated results

ResultUnits or basisHow to interpret it
Test resistance fitα in m/kg, Rₘ in m⁻¹, slope, intercept, RMS and R²Verify the input units and regression fit before using the result.
Formation filtrate, dry loading and cycle timingm³/m², kg/m² and sInspect the formation equation check and the medium and cake time contributions.
Required total area and per-filter aream²Use the number of active identical filters to interpret the area.
Installed dry capacity and signed margint/hCompare capacity with feed dry solids. Overload still balances the full feed.
Formation filtrate, drainage, final cake water and washt/hCheck product flows and the full process water balance.

Worked verification example

Set 6 dry t/h, 9 t/h feed water, 66.666667% formed cake solids, 20% final moisture, 100 kPa and 1 mPa·s. Use α = 10¹¹ m/kg and Rₘ = 10⁹ m⁻¹. Set formation to 200.2 s and the other stages to 39.8 s total without wash. Select two filters, or check installed capacity with 10 m² per filter.

CheckCalculation or basisExpected value
Test pairs for a 1 m² lab testVolume in L and time in s at the same pressure, viscosity and C10:50.1, 20:200.2, 30:450.3
Formed cake water and formation filtrate6 × (1−0.666667)/0.666667 and 9 minus formed water3 and 6 t/h
Formation C and z6,000 kg/h divided by 6 m³/h, positive root at 200.2 s1,000 kg/m³ and 0.02 m³/m²
Dry loading and active areaCz and S × 240 / (Cz)20 kg/m² and 20 m² total
Final cake water and drainage6 × 0.20/0.80 and formed minus final water1.5 and 1.5 t/h
Combined liquid and installed capacityFormation plus drainage, 20 m² installed7.5 t/h water and 6 dry t/h capacity
The three worked test points and the fitted line on the t/z versus z basis.
The three worked test points and the fitted line on the t/z versus z basis.

Diagnostics and calibration

What you seeWhat to check
Fitted resistance is negativeCheck the test time origin, reporting units and the chosen constant-pressure segment.
Calculated final cake contains more water than formed cakeCheck that formed solids and final wet-basis moisture describe the intended sequence.
Installed capacity below feedReview total cycle time and active area. Use the negative margin to quantify the overload.

References