Summary
Size filtration area or check installed dry-solids capacity from a constant-pressure cake-resistance test and a specified operating cycle.
Ribbon Flowsheet → Dewatering → Filters
Model key DPSIM.Dewatering.CakeResistanceFilter
Ports
| Port | Direction | Meaning |
|---|---|---|
| Feed | Input | Slurry to be filtered. |
| Wash water | Optional input | Clean wash water included in the liquid balance. |
| Cake | Output | All dry feed solids and water at the specified final cake moisture. |
| Filtrate + drainage | Output | Formation filtrate, post-formation water and optional wash water. |
Configuration in DPSIM
- Open the filter editor. Set Operating Basis, including formed-cake dry solids, final moisture, cycle timing and the number of active units.
- In Test Data choose entered resistances or Fit constant-pressure test. For a fit, enter the test conditions and paste two spreadsheet columns, or enter one volume:time pair per line.
- On Review, inspect fitted resistances, test basis and active area. Apply and run to record the case in Calculated Parameters.
- Check product water and the capacity margin at the installed area. Connect Wash water only for clean water and allow time for it in the cycle.

Parameters and units
| Input | Units or options | Initial value or basis | Use |
|---|---|---|---|
| Operating mode | Size required area or Check installed capacity | Size required area | Use installed mode with active area per filter and the number of operating filters. |
| Identical filters and installed area | Count and m² per filter | 1 and 10 m² | Use active operating filters. Total installed area is count times per-filter area. |
| Operating pressure and viscosity | kPa and mPa·s | 100 and 1 | Use the values for the actual cycle. DPSIM converts to Pa and Pa·s. |
| Formed cake dry solids and final cake moisture | % w/w and % wet basis | 66.7 and 20 | These are two distinct process conditions. Final cake must be at least as dry as the formed cake. |
| Cycle stages | s | Formation 200.2, wash 0, post-formation 20, turnaround 9.8 | Set elapsed times for each stage. A positive wash inlet needs a positive wash time. |
| Resistance source, α and Rₘ | Entered or fitted, m/kg and m⁻¹ | Entered, 10¹¹ and 10⁹ | Use resistances for the material and pressure range, or fit from test data. |
| Test area, pressure, viscosity and C | m², kPa, mPa·s and kg/m³ | Enter actual test values for fitting | Use dry solids retained per m³ of formation filtrate for the test C. |
| Filtrate test pairs | Litres and seconds | Measured positive volume and time | Use at least two strictly increasing positive pairs. The optional origin 0:0 is excluded from regression. |
Calculation and assumptions
Constant-pressure formation
Let V be formation filtrate volume, A active area and z = V/A in m³/m². C is dry retained solids per m³ of formation filtrate. Use α in m/kg, Rₘ in m⁻¹, μ in Pa·s and ΔP in Pa.
tₑ = (μ/ΔP) [Rₘ z + α C z² / 2] tₑ/z = (μRₘ/ΔP) + [μαC/(2ΔP)] z
Fit and operating calculation
The unweighted fit of tₑ/z against z recovers Rₘ from the intercept and α from the slope using the laboratory pressure, viscosity and C. DPSIM rejects substantially negative fitted resistance. In operation, C comes from the feed dry solids divided by water displaced during formation. Post-formation drainage and wash water are outside that formation volume.
Area and capacity
At the selected formation time, solve the positive root for z. The dry loading per active area per cycle is Cz. With feed dry mass rate S in kg/s and complete cycle time T in seconds, calculate required total area and installed dry capacity.
Dry loading per cycle = C z Required area = S T / (C z) Installed capacity = installed active area × C z / T
Water balance
Formed-cake water follows the formed solids mass fraction. Final cake water follows the entered wet-basis moisture. Their difference is post-formation drainage. The liquid product combines formation filtrate, drainage and any wash water. All feed dry solids report to Cake by size and component.
Application limits
Use representative constant-pressure tests and check pressure transfer if operating and test pressures differ. The model assumes fixed resistances, complete solids capture and a specified final moisture. Cake compressibility, fine-solids breakthrough and washing efficiency require separate test data or analysis.
Calculated results
| Result | Units or basis | How to interpret it |
|---|---|---|
| Test resistance fit | α in m/kg, Rₘ in m⁻¹, slope, intercept, RMS and R² | Verify the input units and regression fit before using the result. |
| Formation filtrate, dry loading and cycle timing | m³/m², kg/m² and s | Inspect the formation equation check and the medium and cake time contributions. |
| Required total area and per-filter area | m² | Use the number of active identical filters to interpret the area. |
| Installed dry capacity and signed margin | t/h | Compare capacity with feed dry solids. Overload still balances the full feed. |
| Formation filtrate, drainage, final cake water and wash | t/h | Check product flows and the full process water balance. |
Worked verification example
Set 6 dry t/h, 9 t/h feed water, 66.666667% formed cake solids, 20% final moisture, 100 kPa and 1 mPa·s. Use α = 10¹¹ m/kg and Rₘ = 10⁹ m⁻¹. Set formation to 200.2 s and the other stages to 39.8 s total without wash. Select two filters, or check installed capacity with 10 m² per filter.
| Check | Calculation or basis | Expected value |
|---|---|---|
| Test pairs for a 1 m² lab test | Volume in L and time in s at the same pressure, viscosity and C | 10:50.1, 20:200.2, 30:450.3 |
| Formed cake water and formation filtrate | 6 × (1−0.666667)/0.666667 and 9 minus formed water | 3 and 6 t/h |
| Formation C and z | 6,000 kg/h divided by 6 m³/h, positive root at 200.2 s | 1,000 kg/m³ and 0.02 m³/m² |
| Dry loading and active area | Cz and S × 240 / (Cz) | 20 kg/m² and 20 m² total |
| Final cake water and drainage | 6 × 0.20/0.80 and formed minus final water | 1.5 and 1.5 t/h |
| Combined liquid and installed capacity | Formation plus drainage, 20 m² installed | 7.5 t/h water and 6 dry t/h capacity |

Diagnostics and calibration
| What you see | What to check |
|---|---|
| Fitted resistance is negative | Check the test time origin, reporting units and the chosen constant-pressure segment. |
| Calculated final cake contains more water than formed cake | Check that formed solids and final wet-basis moisture describe the intended sequence. |
| Installed capacity below feed | Review total cycle time and active area. Use the negative margin to quantify the overload. |