Summary
Use Dobby’s general steel-wool drainage regression to partition slurry solids between magnetic and non-magnetic products.
Ribbon Flowsheet → Concentration → Magnetic Separation
Model key DPSIM.Concentration.WhimsDobbyGeneral
Ports
| Port | Direction | Meaning |
|---|---|---|
| Feed | Input | Slurry with a PSD and dry component mass by size. |
| Magnetic | Output | Magnetically captured and optionally entrained solids, with a specified share of feed water. |
| Non-magnetic | Output | The remaining dry solids and water. |
Configuration in DPSIM
- In Material, enter a measured profile for each populated component that uses capture. Choose None for a population with zero capture. When using a field curve, use measurements from the same sample and basis.
- In Magnetic Field & Matrix, enter the background induction and test loading. Identify whether its numerator represents all dry solids or the magnetic mineral mass in the feed.
- In Slurry & Capacity, select superficial velocity basis, then set water recovery and optional entrainment and capacity. Separate the gross frontal area used for superficial velocity from the free-area calculation.
- In Review, compare the draft preview with the last solver report. Apply, run the flowsheet and read Calculated Parameters before recording design inputs or results.
Parameters and units
| Input | Units or options | Initial value or basis | Use |
|---|---|---|---|
| Component susceptibility | SI volumetric or m³/kg mass susceptibility | Measured for each solid population | Use a constant or field curve. For mass susceptibility enter the measurement on a mass basis and confirm the component density used in the conversion. |
| Background induction B | T | Measured away from the matrix wire | Enter the field on the test basis. Use zero for a zero-field check. |
| Measured matrix gradient | T/m | Optional test record | Record the test conditions. The correlation uses background induction. |
| Test matrix loading Lₘ | kg/kg | Calibration test value | Use the entered dry feed mass or magnetic mineral mass per mass of matrix on the same basis as the experiment. |
| Parallel units | Positive integer | 1 | Split feed slurry flow equally among identical operating units. |
| Superficial velocity source | Measured m/s or calculated from gross area | Measured or flow / area | For calculated velocity, enter gross active frontal area in m² per unit. Convert per-unit m³/h to m³/s first. |
| Free area | Measured fraction or flat-plate geometry | Optional | Opening velocity is a diagnostic. For flat parallel plates, use opening/(opening + thickness) if the geometry fits that assumption. |
| Open top class representative size | µm | Measured representative diameter | Required for a populated open top class when a size-dependent calculation is active. |
| Feed water reporting to Magnetic | % of water feed | Process input | Set the fraction independently from magnetic capture. |
| Conditional entrainment curve | µm and % of uncaptured solids | Optional, zero when omitted | Provide a curve covering all populated sizes. |
| Capacity curve | m³/h per unit at stated loading | Optional | Select the kg/kg matrix test loading basis or a measured retained-load basis in kg/m³ of matrix. |
| Calibration and extrapolation | Confirmation and Allow flagged extrapolation | Review against test envelope | Confirm the basis when magnetic capture is active. Review flagged points individually. |
Calculation and assumptions
Scope of the fit
Dobby’s general steel-wool drainage regression uses 72 laboratory tests across hematite, ilmenite, sphalerite and chalcopyrite. Its standard error of estimate in that dataset was 9.7 percentage points. Equation 28 in the thesis and equation 9 in the paper document its basis.
Numerical units and field term
Use background induction B in T, superficial velocity u in m/s and representative particle diameter d in µm. Convert to H in kG and U in cm/s. Convert mass susceptibility to volumetric using component density, then use the numerical CGS susceptibility k. Mₘ is the wire magnetization term for the steel wool in the calibration.
H = 10B U = 100u k = χᵥ,SI / (4π × 10⁻⁴) Mₘ = min(H, 10) kG G = H Mₘ k^1.8 d^1.6 / (U^1.3 Lₘ^1.1) Raw magnetic capture (%) = −58.9 + 38.3 log₁₀(G)
Class split and checks
Use the arithmetic midpoint for closed classes and half the finest aperture for the pan. At positive field and susceptibility, DPSIM bounds magnetic capture to 9–95%. A zero field or susceptibility produces zero magnetic capture. Conditional entrainment applies to uncaptured material, then the complementary dry solids go to Non-magnetic. The water split is specified independently.
Partition to Magnetic = Rₘ + (1 − Rₘ) E(d) Capacity margin = tested admissible slurry flow − actual slurry flow per unit
Calibration envelope
The thesis envelope used by DPSIM is 0.04–1.30 T, 8.5–49 µm, 0.02–0.22 m/s, 0.17–2 kg/kg and k from 0.25 to 8. Compare your matrix, drainage procedure and susceptibility measurements with that basis. The fitted wire term saturates at 10 kG. At higher background field the product H Mₘ continues to change.
Calculated results
| Result | Units or basis | How to interpret it |
|---|---|---|
| Per-unit slurry flow and velocity basis | m³/h per unit and m/s | Check parallel unit count and the gross frontal area used. Opening velocity, where reported, is a separate diagnostic. |
| Raw capture, bounded capture and total partition | % of each feed component and size class | Use the class table in the last solver report. Total partition includes conditional entrainment. |
| Magnetic and non-magnetic products | t/h dry solids and t/h water | Confirm separate dry-solids and water balances. Inspect grade and size distributions in the products. |
| Capacity check and signed margin | m³/h per unit | Admissible flow minus actual flow. An overload reports a warning while the products still balance the full feed. |
| Extrapolation and untested capacity | Status by point or by capacity check | Inspect flagged classes and review any capacity point marked Not checked. |
Worked verification example
Use B = 0.09 T, u = 0.10 m/s, Lₘ = 0.67 kg/kg, k = 8 and d = 32 µm. For the balance, use 100 dry t/h of that class and 200 t/h water, conditional entrainment of 10% and 25% of feed water to Magnetic.
| Check | Calculation or basis | Expected value |
|---|---|---|
| Field and wire term | H = 10 × 0.09, Mₘ = min(H, 10) | 0.9 and 0.9 kG |
| Logarithmic capture group | log₁₀(G) on the published basis | 2.833605 |
| Raw magnetic capture | −58.9 + 38.3 × 2.833605 | 49.6271% |
| Magnetic and entrained dry mass | Apply entrainment to the uncaptured 50.3729 t/h | 49.6271 and 5.0373 t/h |
| Magnetic and non-magnetic dry mass | Sum and complement | 54.6644 and 45.3356 t/h |
| Magnetic and non-magnetic water | 25% independent split | 50 and 150 t/h |

Diagnostics and calibration
| What you see | What to check |
|---|---|
| Missing susceptibility for a populated component | Provide a measured profile for that population or deliberately select None. Update the lookup if the component name changed. |
| Velocity or loading appears out of range | Confirm superficial velocity and use the actual calibration numerator. Opening velocity and retained bed load answer different diagnostic questions. |
| Expected capture differs from reported partition | Compare raw capture, bounded capture, conditional entrainment and total partition for the same class. |
| Preview and solver show different values | Apply the settings and rerun. Verify that the solver feed and the draft feed snapshot describe the same operating condition. |